In sound resistant room
(random check) : |
| |
- Every half an hour for a
set for inspection. |
| |
- Assemble a whole ceiling
fan for inspection the following : |
| |
1. Starting. |
2. R. P. M. |
| |
3. Stec., AMP, Watt voltage,
Hi-pot. |
4. Balance. |
| |
5. 3 speed. |
6. Reverse. |
| |
7. Appearance.c |
8. The shortage of screws. |
 |
Packing assembly line. |
| |
Inspect all parts to see if
package are correct and completed. |
 |
Q.A. procedure (final inspection,
random check). |
| |
- Q. A. engineer randomly check
the following from finish goods for quality assurance : |
| |
1. Starting . |
2. R. P. M. |
| |
3. Spec., AMP, Watt, Voltage,
Hi-pot. |
4. Balance. |
| |
5. 3 speed. |
6. Reverse. |
| |
7. Appearance. |
8. The shortage of screws. |
| |
9. Noise checking. |
10. Temperature test. |
| |
11. Motor lock test. |
12. Blade arm bracket pitch. |
| |
13. Switch box life assurance. |
14. Drop test. |