AIR COOL Q. C. / MANUFACTURING PROCESS FLOW CHART

Random check on receiving parts from sub-contractors.
100% inspection on all housing parts.

PROCESS FLOW CHART DETAILS
Motor stator wiring
Hi-pot test 1500V / 1 seconds
Motor assembly
 
Station 1
Inspect the wiring connection and leakage prevention
Station 2
Low voltage star 80V (warming up)
Hi-pot test 1200V / 2 seconds
Rotating test 120V, 60Hz
Starting & balance assurance
Q.C. room
Low voltage star 80V (warming up)
Hi-pot test 1200V / 1 second
Noise checking
Starting Test at 32 volts
Appearance checking
Starting, R.P.M. spec., AMP, watt,
voltage, hi-pot, balance...etc.
Final packing assembly
Inspect all parts
Warehouse
 
O.A. Procedure
Quality assurance for all points (random check)
Process includes all Q.C. procedure of station 2 and Q.C. room

 
Taiwan, 75, Chung Shan Rd., Sec. 3 Tantze 427 Taichung
China, Youth Induserial park, Chen Jiang, Hui, Zhou, GuangGong

Taiwan 886-4-25322151; China 752-332-1558
Taiwan 886-4-25335621; China 86-752-322-1558
Taiwan : aircool@ms11.hinet.net
China : hzyoungo@pob.huizhou.gd.cn